Skip to content

Tasks — Praesenz

Central task tracker. Updated by agents and humans. Each task has an owner (role), status, and target repo.

Format

- [ ] Task description — @role — repo: praesenz/xxx — priority: P0/P1/P2
- [x] Completed task — @role — completed: 2026-03-27

In Progress

  • Containerize UE5 Linux build (Léa avatar + Pixel Streaming) — @engineering — repo: praesenz/engineering-avatar — priority: P0
  • Wire orchestrator to UE5 avatar via WebSocket — @engineering — repo: praesenz/engineering-ai — priority: P0
  • Test TTS (Kokoro via speaches) end-to-end — @engineering — repo: praesenz/engineering-ai — priority: P1

Backlog

  • Integrate NeuroSync for lip-sync (replaces Audio2Face, ADR-010) — @engineering — repo: praesenz/engineering-avatar — priority: P0
  • Per-persona NeuroSync tuning (sommelier, fromager, traiteur, boucher) — @engineering — repo: praesenz/engineering-avatar — priority: P1
  • Add idle animations (Mixamo) to MetaHuman — @engineering — repo: praesenz/engineering-avatar — priority: P1
  • RAG document ingestion for wine sommelier persona — @engineering — repo: praesenz/engineering-ai — priority: P1
  • Validate Helm chart on RKE2 cluster — @engineering — repo: praesenz/engineering-infra — priority: P1
  • Configure Fleet GitOps for auto-deploy — @engineering — repo: praesenz/engineering-infra — priority: P2
  • Measure end-to-end latency (target 1.0-1.8s, ADR-009/010) — @engineering — repo: praesenz/engineering-avatar — priority: P1
  • Per-site BOM: 16 GB master + GPU-less thin workers + 5G router (ADR-009) — @product — repo: praesenz/business-product — priority: P1
  • Akeneo + Equadis (GS1 GDSN) PIM connectors (ADR-013) — @engineering — repo: praesenz/engineering-ai — priority: P2
  • Central mini-HPC sizing for >30 kiosks (NVIDIA 48 GB, ADR-011) — @engineering — repo: praesenz/engineering-infra — priority: P2
  • Infomil / multi-enseigne outreach + partnership T&C (ADR-012) — @product — repo: praesenz/business-company — priority: P1
  • Update pricing models with actual hardware costs — @product — repo: praesenz/business-product — priority: P2
  • Prepare demo script for presales — @presales — repo: praesenz/business-product — priority: P2
  • Add GPU monitoring (DCGM + Grafana) — @engineering — repo: praesenz/engineering-infra — priority: P2
  • Kiosk thin client setup (SLE Micro + Chromium) — @engineering — repo: praesenz/engineering-infra — priority: P2

Done

  • UE5 5.5 built from source on Linux — @engineering — completed: 2026-03-22
  • MetaHuman "Gavin" created — @engineering — completed: 2026-03-23
  • Pixel Streaming working in browser (WebRTC) — @engineering — completed: 2026-03-23
  • Linux packaging (Shipping build, 4.2 Go) — @engineering — completed: 2026-03-23
  • Conversational pipeline validated (STT + LLM + Qdrant) — @engineering — completed: 2026-03-22
  • Orchestrator rewritten (FastAPI, connection pooling, /chat + /health) — @engineering — completed: 2026-03-22
  • Stack A pilot deployed (Windows VM + Virbe on node 248) — @engineering — completed: 2026-03-16
  • Harbor, Qdrant, Rancher cluster verified — @engineering — completed: 2026-03-22
  • Project structure created (praesenz org, 5 repos, 4 teams) — @cto — completed: 2026-03-27